Please fill out the form below and we will get back to you as soon as possible.

Every sub has done it at least once: you bid a job off a one-paragraph description, win it, show up, and find out the scope on paper is nothing like the scope in your head. Maybe the spec called for a fixture grade you didn't price. Maybe there's an addendum that moved a wall. Maybe the drawing shows three bathrooms and the text description only mentioned "remodel bathroom." By the time you find out, you're already committed to a number that doesn't match the real job.
That gap between what's described and what's actually drawn is one of the most common ways bids go sideways for both sides. The GC thinks they gave you enough to price it. You think you priced what they asked for. Nobody's lying — the information just never made it into your hands in a usable form. That's the problem GC Bid Sets is built to close.
If you're running multi-trade projects as a general contractor on LocalFixx, you can now attach plan and spec PDFs — up to 50MB each — directly to a project. Once they're attached, any subcontractor who can see and bid on that project's trade scopes can open those documents right in their browser before they submit a bid.
No app to install, no separate login to a plan room, no emailing a 40MB PDF back and forth until someone's inbox rejects it. The documents live on the project, sit next to the scope you're bidding, and open using the same PDF viewer your browser already has built in — pan, zoom, page through, search, print, all standard browser behavior.
This is context, not markup. You're viewing the PDF as-is in the browser's native viewer — there's no in-app redlining or annotation layer here. If you need to mark up a drawing, you'll still do that in whatever tool you already use for that. What this solves is a narrower but more common problem: making sure you've actually seen the real documents before you type a number into a bid field.
This isn't a nice-to-have convenience feature — it changes the accuracy of the number you submit, which changes whether the job is profitable once you're in it.
A bid built off a text description alone is really an estimate of an estimate. You're pricing your best guess at what the GC meant, and the GC is trusting that your best guess lines up with what's actually on the drawing. When it doesn't, one of two things happens: you eat the difference because you already committed to a price, or you go back for a change order and it turns into a friction point with the GC before the job has even really started. Neither outcome is good for the relationship or for getting picked again on the next project.
Seeing the actual plans and specs before you bid gives you a chance to catch the expensive stuff early — a fixture spec that's a tier above what you assumed, a room count that doesn't match the summary, an addendum that changed a load-bearing detail. Catching that during bidding costs you a few extra minutes reading a PDF. Catching it after you've started the work costs you money, time, and possibly the relationship with that GC.
It also works in your favor on the trust side. A sub who clearly bid off the real plans — and whose number reflects what's actually drawn — reads as more credible to a GC than a sub whose bid is suspiciously round or generic. If you're trying to get repeat work from the same GC, being the person who bids accurately because you actually looked at the documents is a quiet but real differentiator.
Whether or not a project comes with an attached PDF, the discipline of reading plans and specs before you commit to a number is worth building as a habit. Some general principles that apply no matter what platform or paper trail you're working from:
None of this replaces good judgment or experience reading a set — but the tools you use should make it easier to actually do the reading, not harder. A plan you have to request by email, wait a day for, and then squint at on a phone screen is a plan that quietly discourages you from checking it at all. A plan that's already sitting next to the scope you're bidding, one click away, in a viewer your browser already knows how to use — that's a plan you'll actually open.
GC Bid Sets doesn't change how you estimate a job. It changes whether you're estimating the real job or a rough sketch of it. If you're a GC, attaching your plans and specs costs you two minutes and removes a recurring source of change-order arguments. If you're a sub, checking those documents before you bid costs you a few extra minutes of reading and can save you from pricing a job you didn't actually understand. Either way, it's a small habit that pays for itself the first time it catches something.
These tools are built into every pro's Vendor Portal on LocalFixx — no separate app, no extra setup.